工程总承包模式下模拟工程量清单编制要点研究
DOI:
作者:
作者单位:

山西工商学院

作者简介:

通讯作者:

中图分类号:

基金项目:


Research on the key points of drawing up the simulated bill of quantities under the model of project general contracting
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    工程总承包模式下,采用模拟工程量清单招标因其节省工期受到业主青睐,但其固有的“模拟”特性依旧会给业主带来较大风险。为解决此问题,提高模拟工程量清单编制的准确性是根本途径。本文从模拟工程量清单编制的流程中识别出三大操作要点,分别是寻找对标项目、模拟工程量清单的调整以及模拟工程量清单的审核,对三大操作要点进行完善改进,帮助业主提高模拟工程量清单编制的质量,降低成本管控风险。

    Abstract:

    In the general contracting mode, the use of simulated bill of quantities bidding is favored by the owners because of its saving time, but its inherent "simulation" characteristics will still bring greater risks to the owners. In order to solve this problem, improving the accuracy of the simulation bill of quantities is the fundamental way. In this paper, three major operational points are identified from the process of the preparation of the simulated bill of quantities, which are looking for the standard project, the adjustment of the simulated bill of quantities and the review of the simulated bill of quantities. The three operational points are improved and improved to help the owner improve the quality of the preparation of the simulated bill of quantities and reduce the risk of cost control.

    参考文献